IMG_4681 east peak web_900x643
Originally uploaded by singram50
The east end gable is ready to be lifted into place. Currently working on the west end gable, which will have a ten-foot header above the opening to the (nonexistent) hallway leading to the (nonexistent) room above the (nonexistent) garage.